Feasibility Study for 1MW & 600kW Rooftop Solar PV

Grey Green’s assessment dealt with each of the client’s 10 buildings at different sites around the country as follows:

Perform detailed electricity consumption assessments,  determined each building’s electrical reticulation boundaries, performed structural assessment of the roof structure of each of the buildings with respect to its ability to accommodate the anticipated wind loads imposed by the fitment of a PV system; performed a site assessment of each building roof with regard to the likely impact of shading, space available and ease of access on the production and maintenance of the system.

Arising from those assessments, we proposed with detailed specifications and budget estimates, the largest yielding PV installation possible, stating R/kWh given a 25 year lifetime for the plant. We also prepared a yield assessment for the proposed PV Plant in terms of solar irradiation and electricity production. Our financial analysis presented the simple cost effectiveness based on the capital cost, operating cost and value of the offset electricity savings over the system life span assuming instantaneous embedded consumption and using the tariff applicable to the building as well as payback period.